Express 4500 V8-6.6L DSL Turbo (2009)
4. Install the 2 wiring harness routing bolts and tighten to 10 Nm (89 lb in).
5. Position the right engine wiring harness bracket and install the 2 bolts and tighten to 10 Nm (89 lb in).
6. Connect the right engine wiring harness connector.
7. Install the positive cable to the auxiliary generator, perform the following:
1. Install the positive cable.
2. Install the positive cable nut and tighten to 9 Nm (80 lb in).
3. Slide the boot to cover the terminal stud.