chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Engine - Intake Manifold Inspection/Replacement|Page 1313 > < Engine - Intake Manifold Inspection/Replacement
Page 1
background image

Intake Manifold: Service and Repair

Fig. 9 Intake Manifold Tightening Sequence

Fig. 10 Fuel Injector Line Installation

Van

1.

Disconnect batteries, then remove engine cover.

2.

Remove air cleaner assembly.

3.

Disconnect necessary electrical connectors and hoses, and remove EGR/EPR switches.

4.

Remove crankcase depression regulator valve hoses from intake manifold.

5.

If equipped with A/C, remove rear compressor bracket.

6.

Remove fuel filter to intake manifold bracket.

7.

Remove vacuum pump. After removal, place a rag or cover over hole to prevent foreign material from entering engine.

Engine - Intake Manifold Inspection/Replacement|Page 1313 > < Engine - Intake Manifold Inspection/Replacement