chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Grounding Point > < Underhood Electrical Center or Junction Block Replacement|Page 7031
Page 3
background image

2. Install the fasteners (1) securing the electrical center board  (2).

Tighten the fasteners to 7 Nm (62 lb in).

3. Connect the positive battery cable. Refer to Battery Positive Cable Replacement   (See: Battery/Battery Cable/Positive/Service and Repair/Battery

Positive Cable Replacement).

4. Install the electrical center cover (1).

Grounding Point > < Underhood Electrical Center or Junction Block Replacement|Page 7031