chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Handling/Shipping/Scrapping|Page 10056 > < Handling/Shipping/Scrapping|Page 10054
Page 17
background image

8. Cut two 4.6-M (15-ft) deployment wires from a multi-strand wire 0.8 sq.mm (18 gage) or thicker. Use these wires to fabricate the driver

deployment harness.

9. Strip 13 mm (0.5 in) of insulation from both ends of these wires.

10. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the air bag.

11. Twist together one connector wire lead to one deployment wire.
12. Inspect that the previous connection is secure.

13. Bend flat the twisted connection.
14. Secure and insulate the connection using electrical tape.

15. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
16. Connect the deployment harness to the inflatable restraint front side impact module (LH) yellow 2-way connector.

17. Route the deployment harness out of the vehicle's driver side.

Handling/Shipping/Scrapping|Page 10056 > < Handling/Shipping/Scrapping|Page 10054