chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Intake Manifold Cover Replacement|Page 4310 > < Intake Manifold Cover Replacement|Page 4308
Page 3
background image

14. Loosen the valve rocker arm bolts.

15. Important:  Place the valve train components in a rack in order to ensure that the components are installed in the same location from which they

where removed.

Remove the valve rocker arms.

16. Remove the push rods.

^

The intake push rods measure 147.51 mm (5.81 inch).

^

The exhaust push rods measure 154.87 mm (6.1 inch).

17. Remove the lower intake manifold gaskets and seals.
18. Clean the lower intake manifold gasket and seal surfaces on the cylinder heads and the engine block.
19. Clean the gasket and seal surfaces on the lower intake manifold with degreaser.
20. Remove all the loose room temperature vulcanizing (RTV) sealer (1).

Installation Procedure 

Intake Manifold Cover Replacement|Page 4310 > < Intake Manifold Cover Replacement|Page 4308