chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Power and Ground Distribution > < Diagram Information and Instructions|Page 5678
Page 2
background image

1. Align the starter motor to the engine.
2. Install the starter bolts (1,2) finger tight until seated.

NOTE:  Refer to Fastener Notice in Service Precautions.

Tighten
Tighten the bolts to 43 N.m (32 lb ft).

3. Install the positive battery cable (7) and the solenoid BAT terminal nut (6) finger tight to the starter motor.

Install the starter solenoid wire (4) and the starter solenoid S terminal nut (5) finger tight to the starter motor.

Tighten
-

Tighten the solenoid BAT terminal nut (6) to 10 N.m (89 lb in).

-

Tighten the starter solenoid S terminal nut (5) to 2.3 N.m (20.5 lb in).

1. Install the torque converter covers.
2. Install the lower air deflector
3. Lower the vehicle.
4. Connect the negative battery cable.

Power and Ground Distribution > < Diagram Information and Instructions|Page 5678