chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 24415 > < Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 24413
Page 7
background image

Installation Procedure

1. Install the side outer panel to the body side outer panel fasteners.
2. Install the side inner panel.
3. Install the cargo box bridge center panel.
4. Install the rear compartment cover assembly. 

Rear Body Opening Frame Drain Valve Replacement - Front

Rear Body Opening Frame Drain Valve Replacement - Front

Removal Procedure

1. Lower the mid gate.
2. Remove the rear compartment cover.
3. Remove the cargo load mat.

4. Using a trim panel removal tool or a suitable flat bladed tool, carefully pry the drain valve up from the cargo floor.
5. Remove the drain valve from the vehicle.

Installation Procedure

1. Align the drain valve into the opening in the floor.
2. Press down on the drain valve to fully seat the valve into the floor.
3. Install the cargo load mat.
4. Install the compartment cover.
5. Close the mid gate.

Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 24415 > < Cargo Box Front Gutter Side Drain Replacement - A Cup|Page 24413