K 1500 Suburban 4WD V8-4.8L VIN V (2003)
10. Position the engine wire harness.
11. Connect the following electrical connectors to both sides of the engine:
-
Main coil (2)
-
Fuel injectors
12. Install the harness clips to the fuel rail (1).
13. Install the CPA retainers.
14. Connect the following electrical connectors:
-
MAP sensor (1)
-
Knock sensor (2)
15. Install the knock sensor harness connector to the intake manifold.
16. Connect the EVAP purge solenoid electrical connector (1).
17. Connect the generator electrical connector (3).
18. Install the wire harness bracket nut (2).