chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair|Page 6022 > < Air Injection Check Valve|Bank 1|Page 6018
Page 1
background image

Air Injection Control Valve: Service and Repair

REMOVAL PROCEDURE

1. Release the clamp (4) securing the AIR hose to the AIR Pump assembly base.
2. Release the clamp (5) securing the AIR hose to the AIR Pump Shut Off Valve.

3. Remove the AIR Hose from the AIR Pump Shut Off Valve outlet port (3).
4. Remove the vacuum line (5) from the AIR Pump Shut Off Valve vacuum port (4).
5. Release the AIR Pump Shut Off Valve inlet port (1) from the AIR pump outlet hose.

INSTALLATION PROCEDURE

1. Install the AIR Pump Shut Off Valve inlet port (1) to the AIR pump outlet hose.
2. Install the vacuum (5) line to the AIR Pump Shut Off Valve vacuum port (4).

Air Injection Control Valve|Service and Repair|Page 6022 > < Air Injection Check Valve|Bank 1|Page 6018