chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

All Other Service Bulletins for Valve Body: > < A/T - Torsional Rattle With TCC Engaged
Page 2
background image

Illustration

3.

After pivoting U-joints to allow a drill bit access to face of yoke, drill a 21/64" hole in face of each end yoke. Use caution not to damage
U-joint seals (see illustration).

4.

Wrap and tape U-joints with cloth.

5.

Following directions and observing caution notes on kit, fill propshaft with spray foam from the top hole while maintaining propshaft in
vertical position.

When foam begins to ooze out of application hole past the nozzle, enough foam has been dispensed. To prevent spewing of foam on operator,
part, etc., do not remove nozzle from yoke until foaming activity subsides and set-up begins.

6.

Allow foam to set, then remove U-joint cloth cover.

7.

Drill out each end yoke hole and plug with silicone RTV rubber adhesive sealant (hi-heat resistance).

8.

Reinstall propshaft assembly in vehicle.

Labor Operation Number:

T0084

Labor Time

: .9 hours

Add to foam fill propshaft .7

All Other Service Bulletins for Valve Body: > < A/T - Torsional Rattle With TCC Engaged