chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Procedures|Page 14485 > < Deployment Procedures|Page 14483
Page 4
background image

18. Disconnect the LF side impact module connector (1) from the vehicle wiring harness (2) located under the LF seat.

19. Cut the LF side impact module harness connector out of the vehicle leaving at least 16 cm (6 in) of wire at the connector.
20. Strip 13 mm (0.5 in) of insulation from each of the LF side impact module connector wire leads.

21. Cut 26.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment harness.
22. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
23. Twist together 1 end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the side impact module.

Deployment Procedures|Page 14485 > < Deployment Procedures|Page 14483