K 2500 Truck 4WD V8-6.6L DSL Turbo VIN 1 (2002)
1. Install the outlet duct to the turbocharger.
2. Align the outlet duct alignment indicator (1) to the turbocharger alignment indicator (2).
IMPORTANT: The outlet duct must be fully seated against the MAT/IAT sensor with the edge of the seal in the vertical position.
3. Install the outlet duct to the MAT/IAT sensor.
NOTE: Refer to Fastener Notice in Service Precautions.
4. Tighten the outlet duct clamps at the turbocharger and the MAF/IAT sensor.
Tighten
Tighten the clamp to 6 N.m (53 lb in).