chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Fuel Rail Assembly Replacement - Bank 1|Page 6367 > < Fuel Rail Assembly Replacement - Bank 1|Page 6365
Page 5
background image

10. Install the air cleaner outlet duct.
11. Install the bolt holding the positive battery cable junction box and bracket.
12. Replace the upper radiator hose and the two hose clamps.
13. Fill the cooling system. Refer to Draining and Filling Cooling System in Cooling System.
14. Connect the negative battery cables to both batteries.
15. Replace all hold down ties.
16. Start the engine and check for leaks or noises.
17. After the engine warms up, refill the coolant reservoir.

Fuel Rail Assembly Replacement - Bank 1|Page 6367 > < Fuel Rail Assembly Replacement - Bank 1|Page 6365