chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Procedures|Page 13022 > < Deployment Procedures|Page 13020
Page 4
background image

17

Place a 12 V minimum/2 A minimum power source (i.e. vehicle battery) near the shorted end of the SIR deployment harness.

18. Connect the SIR deployment harness wires to the power source. Inflator module deployment will occur when contact is made.
19. Disconnect the SIR deployment harness from the power source

20. Seat 1 banana plug into the other in order to short the deployment harness leads.

CAUTION:  Refer to SIR Deployed Inflator Modules Are Hot Caution in Service Precautions.

21. If the inflator module did not deploy disconnect the adapter and discontinue the procedure. Contact the Technical Assistance Group for further

assistance. Otherwise, proceed to the following steps.

22. Put on a pair of shop gloves.
23. Disconnect the pigtail adapter from the inflator module as soon as possible.
24. Dispose of the deployed inflator module through normal refuse channels.
25. Wash hands with a mild soap.

Deployment Procedures|Page 13022 > < Deployment Procedures|Page 13020