K 2500 Truck 4WD V8-6.6L DSL Turbo VIN 1 (2002)
4. Connect the other end of the pipe (1) to the left fuel rail.
Tighten
Tighten the high pressure pipe from the junction block to the left fuel rail to 44 N.m (32 lb ft).
5. Install the charged air cooler inlet duct to turbocharger charged air cooler outlet. Align the marks on the hose and the intake manifold duct.
Tighten
Tighten the charged air cooler clamp to 6 N.m (53 lb in).