K 30 1 Ton Pickup 4WD V8-379 6.2L DSL VIN J FI (1982)
3. Install head-locating screw and torque to 15---18 ft. lbs., Fig. 36.
4. Torque head-locking screws to 15---18 ft. lbs.
5. Install advance pin and advance pin plug.
6. Turn pump so cover opening is up, and install metering valve.
7. Install throttle shaft, seals and pump cover.