chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Relays and Modules - Fuel Delivery and Air Induction > < Powertrain Control Module (PCM) Programming (Off-board)|Page 4412
Page 3
background image

3. Connect the PCM connectors.

NOTE:  Refer to Fastener Notice in Service Precautions.

4. Tighten the PCM harness connector bolts (2).

Tighten
Tighten the bolts to 8 N.m (70 lb in).

5. Install the PCM cover.
6. Snap the PCM cover over the mounting tabs on the PCM bracket.
7. If equipped with RPO NYS, install the harness ground to the clip attached to the PCM cover.
8. Connect the negative battery cable.
9. If a new PCM is being installed, program the PCM.  See: Testing and Inspection/Programming and Relearning

Relays and Modules - Fuel Delivery and Air Induction > < Powertrain Control Module (PCM) Programming (Off-board)|Page 4412