chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Air Check Valve/Pipe Replacement - Bank 1|Page 7206 > < Air Injection Check Valve|Specifications
Page 1
background image

Air Injection Check Valve: Service and Repair
Air Check Valve/Pipe Replacement - Bank 1

REMOVAL PROCEDURE

CAUTION:  Refer to AIR temperature caution in Cautions and Notices.

1. Remove the clamp from the check valve.
2. Disconnect the AIR hose from the check valve.

3. Remove the check valve from the left side AIR pipe.
4. Remove the left AIR pipe from the exhaust manifold.
5. Before replacing a check valve, test the valve for proper operation.

5.1. Install a vacuum pump to the nipple side of the check valve, AIR pump side.
5.2. Pump the vacuum pump to 10 inches Hg and observe the gauge.
5.3. Replace the check valve if the vacuum bleed down to zero within 5 seconds.

INSTALLATION PROCEDURE

NOTE:  Refer to Fastener Notice in Cautions and Notices.

Air Check Valve/Pipe Replacement - Bank 1|Page 7206 > < Air Injection Check Valve|Specifications