chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

AIR Check Valve/Pipe Replacement - Bank 1|Page 7219 > < AIR Check Valve/Pipe Replacement - Bank 1|Page 7217
Page 1
background image

Air Injection Hose/Tube: Service and Repair
AIR Check Valve/Pipe Replacement - Bank 2

REMOVAL PROCEDURE

CAUTION:  Refer to AIR temperature caution in Cautions and Notices.

1. Remove the clamps and AIR hoses from the AIR system right pipe.

2. Remove the check valve from the AIR pipe.
3. Remove the right AIR pipe from the exhaust manifold.
4. Before replacing a check valve test the valve for proper operation.

4.1. Install a vacuum pump to the nipple side of the check valve, AIR pump side.
4.2. Pump the vacuum pump to 10 inches Hg and observe the gauge.
4.3. Replace the check valve it the vacuum bleeds down to zero within 5 seconds.

INSTALLATION PROCEDURE

NOTE:  Refer to Fastener Notice in Cautions and Notices

AIR Check Valve/Pipe Replacement - Bank 1|Page 7219 > < AIR Check Valve/Pipe Replacement - Bank 1|Page 7217