chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Procedures|Page 13086 > < Deployment Procedures|Page 13084
Page 6
background image

9. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.

10. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the air bag.

11. Twist together one connector wire lead to one deployment wire.
12. Inspect that the previous connection is secure.

13. Bend flat the twisted connection.
14. Secure and insulate the connection using electrical tape.

15. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
16. Connect the deployment harness to the inflatable restraint steering wheel module yellow 2-way connector.

17. Route the deployment harness out of the vehicle's driver side.

Deployment Procedures|Page 13086 > < Deployment Procedures|Page 13084