chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Intake Manifold Replacement - Lower|Page 2397 > < Intake Manifold Replacement - Lower|Page 2395
Page 8
background image

11. Install the heater inlet pipe.
12. Install the heater inlet pipe nut.

Tighten
Tighten the heater inlet pipe nut to 25 N.m (18 lb ft).

13. Install the power steering pump to the front engine cover. Refer to Power Steering Pump Replacement in Steering and Suspension.

13.1.

Install the fuel injector O-rings using GM P/N 12345616 (Canadian P/N 993182) or equivalent.

13.2.

Install the injector nozzles into the lower intake manifold injector bores.

13.3.

Press on the injector rail using the palms of both hands until the injectors are fully seated.

14. Install the fuel injector bolts.

Tighten
Tighten the fuel injector rail bolts to 10 N.m (89 lb in).

15. Connect the fuel return pipe to the fuel injector rail. Refer to Fuel Hose/Pipes Replacement (Engine Compartment) in Powertrain Management.

Intake Manifold Replacement - Lower|Page 2397 > < Intake Manifold Replacement - Lower|Page 2395