Lumina V6-3.1L VIN J (2000)
INSTALLATION PROCEDURE
IMPORTANT: The new O-ring seals must be lubricated with mineral base 525 viscosity refrigerant oil.
1. Install new O-ring seals onto the liquid line.
2. Install the liquid line into place.
NOTE: Refer to Fastener Notice in Service Precautions.
3. Install the liquid line nut (1) at the orifice.
Tighten
Tighten the liquid line nut to 27 N.m (20 lb ft).
4. Install the liquid line nut (2) at the condenser.
Tighten
Tighten the liquid line nut to 27 N.m (20 lb ft).