chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Charging System > < Technician Safety Information|Page 6694
Page 2
background image

1. Install the positive battery cable into the wiring harness conduit.
2. Install the positive battery cable (2) to the starter motor BAT terminal.

NOTE:  Refer to Fastener Notice in Service Precautions

3. Install the starter solenoid BAT terminal nut (1).

Tighten
Tighten the starter solenoid BAT terminal nut to 10 N.m (89 lb in).

4. Install the positive battery cable (4) and positive battery cable junction block lead nut (3) to the LH underhood accessory wiring junction block.

Tighten
Tighten the positive battery cable junction block lead nut to 25 N.m (18 lb ft).

5. Install the remote positive stud cover (2).
6. Install the positive battery cable to the battery (1).

Tighten
Tighten the positive battery cable terminal bolt to 15 N.m (11 lb ft).

7. Connect the negative battery cable to the battery.
8. Install the air cleaner assembly.
9. Install the LH diagonal brace. 

Charging System > < Technician Safety Information|Page 6694