Malibu L4-2.4L Hybrid (2008)
Caution: To help avoid personal injury, additional precautions must be taken prior to working on the generator control module or the
generator starter. After removing the 36V battery cables from the generator battery, remove both engine wiring harness connectors from
the generator control module. Wait at least 5 minutes and then remove the generator control module cover. Verify voltage levels at all
36V, 12V, and 3-phase connections, are less than 3 volts using a DMM before proceeding.
8. Remove the 2 connector position assurance (CPA) retainers (3).
9. Disconnect the 2 engine wiring harness electrical connectors (2) from the generator control module.
10. WAIT at least 5 minutes in order to allow the voltage stored in the generator control module to discharge.
11. Reposition the generator control module coolant inlet hose clamp (1) at the generator control module using the J 38185 or equivalent.
12. Remove the generator control module coolant inlet hose (2) from the generator control module.