Malibu V6-191 3.1L VIN M SFI (1997)
ISO Flare
12. Back the clamping nut out of the tool body and disassemble the clamping nut and collet assembly. The flare is now ready for use.
13. Bend pipe assembly to match old pipe. Clearance of 19 mm (0.750 inches) must be maintained to all moving or vibrating parts.