Metro L3-061 1.0L VIN 6 TBI (1998)
Canister Purge Solenoid: Testing and Inspection
EVAP Canister Vent Solenoid Inspection
Tools Required
J 39200 Digital Multimeter
1. Disconnect the EVAP canister vent solenoid electrical connector.
2. Measure the resistance between the electrical terminals of the EVAP canister vent solenoid (2) with the DMM (1). The resistance should be 25 to
30 ohms at 20°C (68°F).
3. Replace the EVAP canister vent solenoid if the resistance is not 25 to 30 ohms at 20°C (68°F). Proceed to step 4 if the resistance is within the
specification. Refer to EVAP Canister Vent Solenoid Replacement.
4. Disconnect the EVAP canister vent solenoid hose from the EVAP canister.
5. Blow air into the EVAP canister vent solenoid hose that was disconnected from the EVAP canister. Air should pass through the EVAP canister
vent solenoid.