chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Battery Negative Cable Disconnect/Connect Procedure|Page 5436 > < Battery Negative Cable Disconnect/Connect Procedure|Page 5434
Page 3
background image

INSTALLATION PROCEDURE

1. Install the negative battery cable into the wiring harness conduit.
2. Install the battery cable harness to the retainers (2,3,4).

3. Install the positive battery cable (9) to the starter motor BAT terminal.
4. Install the positive battery cable nut (8) to the starter motor BAT terminal.

NOTE: Refer to Fastener Notice in Service Precautions.

Tighten
Tighten the nut to 10 N.m (89 lb in).

5. Install the ground wire and the transaxle stud nut.

Tighten
Tighten the nut to 25 N.m (18 lb ft).

6. Install the front lower air deflector.
7. Lower the vehicle.

Battery Negative Cable Disconnect/Connect Procedure|Page 5436 > < Battery Negative Cable Disconnect/Connect Procedure|Page 5434