chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Intake Manifold Replacement (Upper)|Page 2518 > < Intake Manifold Replacement (Upper)|Page 2516
Page 5
background image

10. Install the EGR shield to the upper intake manifold. Refer to Powertrain Management.
11. Install the brake booster hose to the vacuum source manifold in the upper intake manifold. Refer to Vacuum Brake Booster Hose Replacement

(Vacuum Hose Replacement) in Hydraulic Brakes.

12. Install the fuel rail. Refer to Powertrain Management.
13. Connect the evaporative emissions canister purge solenoid valve wiring harness connector. Refer to Powertrain Management.
14. Install the right (rear) spark plug wires. Refer to Spark Plug Wire Harness Replacement (3800 L36 (VIN K)) in Ignition System.
15. Install the fuel injector sight shield. Refer to Engine Cover Replacement See: Service and Repair
16. Refill the cooling system with engine coolant. Refer to Draining and Filling Cooling System in Cooling System.
17. Install the throttle body air inlet duct. Refer to Powertrain Management.
18. Connect the battery ground (negative) cable. Refer to Battery Negative Cable Disconnect/Connect in Starting and Charging.
19. Inspect for the proper fluid levels.
20. Inspect for fluid or vacuum leaks.

Intake Manifold Replacement (Upper)|Page 2518 > < Intake Manifold Replacement (Upper)|Page 2516