S10/T10 Blazer 2WD V6-262 4.3L (1988)
6.
Tape the solder and diode.
7.
Reinstall the black plastic conduit.
8.
Reconnect connector to the generator.
9.
Reconnect battery.
This procedure will not affect the operation of the generator light during the bulb check at the beginning of the start cycle.
For vehicles repaired under warranty use, Labor Operation Number: T7990
Labor Time:
.4 Hr