chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Door Hinge Pin and Bushing Replacement - Front Door|Page 18223 > < Door Hinge Pin and Bushing Replacement - Front Door|Page 18221
Page 2
background image

4. Drill 3 mm (1/8 inch) pilot hole at each center punch location.

5. Using pilot hole as guide, drill a 115 mm (29/64 inch) hole through hinge pillar at stud locations. Must be exact drill size (Fig.1.14).
6. Clean and prepare all bare metal surfaces.

IMPORTANT:  Prior to refinishing, refer to GM P/N 4901.M-D Refinish Manual for recommended products.

7. Apply approved anti-corrosion primer.

8. Feed fish wire (such as GM part #15017229) through hinge stud hole and out conduit hole in the pillar (Fig.1.15).
9. Install stud (part #15017230) supplied with service hinge into wire end and pull the stud into position. Draw the studs tight through the pillar using

nuts (part #11516746) supplied. Remove each service nut.

10. Apply a full-bodied caulk to the entire hinge mounting surface to ensure a proper seal.

Door Hinge Pin and Bushing Replacement - Front Door|Page 18223 > < Door Hinge Pin and Bushing Replacement - Front Door|Page 18221