chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Power and Ground Distribution > < Starter Solenoid|Locations|Page 13373
Page 5
background image

Tighten the bolts to 10 N.m (89 lb in).

NOTE:  Refer to Fastener Notice in Service Precautions.

5. Wipe the excess silicone pressed out during the solenoid installation from around the base of the solenoid to make a weather proof seal.

6. Install the cable to the M-terminal stud between the washers and terminal nut.
7. Tighten the M-terminal stud nut.

Tighten the nut to 8 N.m (71 lb in).

8. Using Three Bond silicone 1207B, GM P/N 97720043, seal the M-terminal stud connection (2).
9. Reposition the M-terminal stud weather cover (1).

10. Bench test the starter in a free-run condition prior to installation.
11. Install the starter motor.

Power and Ground Distribution > < Starter Solenoid|Locations|Page 13373