chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Electrical - A/T Stuck in 2nd/3rd Gear/MIL ON/DTC's|Page 11703 > < Electrical - A/T Stuck in 2nd/3rd Gear/MIL ON/DTC's|Page 11701
Page 2
background image

8. Remove the internal wiring harness from the transmission.

Installation Procedure

1. Align the tabs on the new wiring harness U-channel with the solenoid retainer slots for SS3 (3) and SS2 (2) on the control valve assembly. Install

the solenoid retainers (12) for the SS3 (3) and SS2 (2) solenoids.

2. Attach the internal wiring harness connectors to the solenoids, the IMS, and the TFP switch.

^

Connector (8) goes to SS 1 (5)

^

Connector (9) goes to the TFP switch (7)

^

Connector (11) goes to the MAIN MOD solenoid (19)

^

Connector (10) goes to solenoid (2)

^

Connector (13) goes to the IMS

^

Connector (14) goes to the TCC PCS (1)

^

Connector (15) goes to SS2 (2)

^

Connector (16) goes to SS 3 (3)

^

Connector (17) goes to PCS 1 (4)

^

Connector (18) goes to PCS 2 (6)

Important: The internal wiring harness connectors should be in the correct position for installation because of their pre-assembled position in the
U-channel.

Electrical - A/T Stuck in 2nd/3rd Gear/MIL ON/DTC's|Page 11703 > < Electrical - A/T Stuck in 2nd/3rd Gear/MIL ON/DTC's|Page 11701