chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Engine Block Valley Cover Replacement|Page 5365 > < Engine Block Valley Cover Replacement|Page 5363
Page 29
background image

Tighten the bolts/nuts to 10 N.m (89 lb in).

10. Install the EVAP tube and purge solenoid.
11. Install the EVAP canister purge solenoid to the fuel rail bracket and engage the retainer.
12. Connect the EVAP tube quick connect fitting at the intake manifold.

13. Lubricate the MAP sensor seal with clean engine oil.
14. Install the MAP sensor.
15. Install the MAP sensor retainer.

Engine Block Valley Cover Replacement|Page 5365 > < Engine Block Valley Cover Replacement|Page 5363