chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Auxiliary Battery Positive Cable Replacement|Page 17047 > < Auxiliary Battery Positive Cable Replacement|Page 17045
Page 5
background image

3. Install the positive battery cable channel at the plenum front panel.
4. Install the positive battery cable clips to the studs on the plenum front panel.

5. Install the generator battery jumper cable terminal (4) to the mega fuse stud.

Notice: Refer to Fastener Notice.

6. Install the generator battery jumper cable to mega fuse nut (3).

Tighten the nuts to 9 N.m (80 lb in).

Auxiliary Battery Positive Cable Replacement|Page 17047 > < Auxiliary Battery Positive Cable Replacement|Page 17045