Silverado 1500 2WD V8-5.3L Hybrid (2004)
11. If equipped with RPO HP2, position the cable (w/bracket) and install the 3-phase cable bracket to the studs.
12. Install the 3-phase cable bracket nuts (2).
^
Tighten the nuts to 15 Nm (11 ft. lbs.).
13. If equipped with RPO HP2, install the 3-phase cable to the SGCM.
14. Install the 3-phase cable nuts to the SGCM.
^
Tighten the nuts to 9 Nm (80 inch lbs.).
15. Install the SGCM cover and bolts.
^
Tighten the bolts to 9 Nm (80 inch lbs.).