Silverado 1500 2WD V8-5.3L Hybrid (2004)
1. Install the high current sensor carrier.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the high current sensor carrier nut.
Tighten
Tighten the nut to 10 N.m (89 lb in).
3. Install the high current sensor
Energy Storage Box (ESB) Service Disconnect Power Cable Replacement
ENERGY STORAGE BOX (ESB) SERVICE DISCONNECT POWER CABLE REPLACEMENT (WITH RPO CODE HP2)
REMOVAL PROCEDURE
1. Remove the energy storage box (ESB) intermediate cover.
2. Remove the service disconnect power cable nuts (1) from the high current connector (HCC) and the service disconnect switch.
3. Remove the service disconnect power cable (2) from the HCC and service disconnect switch.
INSTALLATION PROCEDURE
IMPORTANT: Ensure that the power cable is installed to the negative side of the HCC.