threads.

5. Carefully remove any corrosion from the electrical ground terminal. Refer to Testing for Intermittent Conditions and Poor Connections   (See:

Testing and Inspection/Component Tests and General Diagnostics/General Electrical Diagnostic Procedures/Circuit Testing/Testing for
Intermittent Conditions and Poor Connections).

6. Install the electrical ground terminal to the new, conductive M7 bolt.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

7. Install the M7 bolt and tighten to  9 Nm (80 lb in).
8. Check for proper system operation.

M6 Weld Nut (Alternative Repair)

Caution:  Use GM approved replacement fasteners with conductive finish for electrical ground repair.

1. If the electrical ground location is accessible from both sides of the panel, a conductive M6 bolt and a conductive M6 nut may be used to secure

the electrical ground terminal. Refer to GM parts catalog for the correct part number and application.

2. Select a location adjacent the damaged M6 weld nut having 20 mm (0.79 ) clearance behind the panel surface and 20 mm (0.79 ) clearance

surrounding the new electrical ground site.

3. Using GM approved residue-free solvent or equivalent, remove any grease from the surface surrounding the ground location and allow to dry.

Note:  Ensure 20 mm (0.79 in) clearance is maintained behind the panel to be drilled.

4. Drill a 10 mm (0.40 in) diameter hole through the panel.
5. Carefully remove paint and primer from the area surrounding the new ground site until bare metal is visible.
6. Using a small brush, apply Dielectric Lubricant GM P/N 12377900 (Canadian P/N 10953529) to the new, conductive M6 bolt threads.
7. Carefully remove any corrosion from the electrical ground terminal. Refer to Testing for Intermittent Conditions and Poor Connections   (See:

Testing and Inspection/Component Tests and General Diagnostics/General Electrical Diagnostic Procedures/Circuit Testing/Testing for
Intermittent Conditions and Poor Connections).

8. Install the electrical ground terminal and new, conductive M6 bolt to the ground location.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

9. Install the conductive M6 nut and tighten to  8 Nm (71 lb in).

Note:  The repair area must be properly refinished to maintain positive electrical grounding.

10. Refinish the repair area using an anti-corrosion primer. Refer to Anti-Corrosion Treatment and Repair   ().
11. Check for proper system operation.

M8 Weld Nut

Caution:  Use GM approved replacement fasteners with conductive finish for electrical ground repair.

1. If the M8 weld nut electrical ground location is accessible from both sides of the panel, a conductive M8 bolt and a conductive M8 nut may be

used to secure the ground terminal. Refer to GM parts catalog for the correct part numbers and application.

2. Select a location adjacent to M8 weld nut having 20 mm (0.79 in) clearance behind the panel surface and 20 mm (0.79 in) clearance surrounding

the new electrical ground site.

3. Using GM approved residue-free solvent or equivalent, remove any grease from the surface surrounding the ground location and allow to dry.

Note:  Ensure 20 mm (0.79 in) clearance is maintained behind the panel to be drilled.

4. Drill a 10 mm (0.40 in) diameter hole through the panel.
5. Carefully remove paint and primer from the area surrounding the new ground site until bare metal is visible.
6. Using a small brush, apply Dielectric Lubricant GM P/N 12377900 (Canadian P/N 10953529) to the new, conductive M8 bolt threads.
7. Carefully remove any corrosion from the electrical ground terminal. Refer to Testing for Intermittent Conditions and Poor Connections   (See:

Testing and Inspection/Component Tests and General Diagnostics/General Electrical Diagnostic Procedures/Circuit Testing/Testing for
Intermittent Conditions and Poor Connections).

8. Install the electrical ground terminal and new, conductive M8 bolt to the ground location.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

9. Install the conductive M8 nut and tighten to  22 Nm (16 lb ft).

Note:  The repair area must be properly refinished to maintain positive electrical grounding.

Procedures|Page 2108 > < Procedures