Silverado 1500 2WD V8-6.0L Hybrid (2009)
5. Install the starter solenoid cable terminal (2) to the fuse stud.
6. Install the starter solenoid cable nut (1) to the fuse stud.
Tighten the nut to 15 Nm (11 lb ft).
7. Install the fuse cover.
8. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (With Single Battery) (See: Starting and
Charging/Battery/Battery Cable/Service and Repair)Battery Negative Cable Disconnection and Connection (With Auxiliary Battery) (See:
Starting and Charging/Battery/Battery Cable/Service and Repair)Battery Negative Cable Disconnection and Connection (With Dual Batteries) (
See: Starting and Charging/Battery/Battery Cable/Service and Repair) .
200 Amp Mega Fuse and Auxiliary Electrical Center 12VDC Junction Block Replacement
200 Amp Mega Fuse and Auxiliary Electrical Center 12VDC Junction Block Replacement