chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Upper Intake Manifold Sight Shield Replacement|Page 2975 > < Upper Intake Manifold Sight Shield Replacement|Page 2973
Page 10
background image

3. Install NEW fuel injector lower O-ring seals onto the injectors.
4. Lubricate the NEW O-ring seals with clean engine oil.

Note:  Push down firmly on both sides of the rail until all the injectors have been seated into their bores.

5. Install the fuel rail.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

6. Install the fuel rail bolts.

Tighten the bolts to 10 Nm (89 lb in).

7. Install a NEW throttle body gasket to the intake manifold.
8. Install the throttle body.
9. Install the throttle body bolts/nuts.

Upper Intake Manifold Sight Shield Replacement|Page 2975 > < Upper Intake Manifold Sight Shield Replacement|Page 2973