Silverado 2500 4WD V8-6.6L DSL Turbo (2010)
9. Install the oil filter.
10. If removed, install the oil pan skid plate bolts and plate.
Tighten the bolts to 20 Nm (15 lb ft).
11. Install the lower EGR cooler pipe. Refer to Exhaust Gas Recirculation Coolant Hoses/Pipes Replacement (See: Powertrain
Management/Emission Control Systems/Exhaust Gas Recirculation/EGR Cooler/Service and Repair/Exhaust Gas Recirculation Coolant
Hoses/Pipes Replacement).