chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Exhaust Gas Recirculation Valve Cooler Replacement|Page 5662 > < Exhaust Gas Recirculation Valve Cooler Replacement|Page 5660
Page 2
background image

3. Remove the upper EGR cooler pipe bolt (2).
4. Remove the lower EGR cooler pipe bolt (1).
5. Remove the EGR cooler pipe from the engine.

Installation Procedure

1. Inspect EGR cooling hose  (4) and replace as necessary.

Caution:  Refer to Fastener Caution   (See: Service Precautions/Vehicle Damage Warnings/Fastener Caution).

2. Position the EGR cooler pipe and hose (3) to the engine.

Tighten the lower bolt (1) to 9 Nm (80 lb in).

Exhaust Gas Recirculation Valve Cooler Replacement|Page 5662 > < Exhaust Gas Recirculation Valve Cooler Replacement|Page 5660