chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Battery Positive Cable Replacement (Diesel)|Page 10193 > < Battery Positive Cable Replacement (Diesel)|Page 10191
Page 8
background image

10. Ensure that the junction block retainers are in the open position (1).
11. Position and align the junction block to the 4 bracket pivots (2), once the pivots are engaged, push the retainers down into the locked position (3).

12. Install the underhood junction block cover.
13. Install the intake manifold cover. Refer to Intake Manifold Cover Replacement   (See: Engine, Cooling and Exhaust/Engine/Intake

Manifold/Service and Repair/Intake Manifold Cover Replacement).

14. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Single Battery)   (See: Negative/Service and

Repair)Battery Negative Cable Disconnection and Connection (Dual Batteries)   (See: Negative/Service and Repair)Battery Negative Cable
Disconnection and Connection (Auxiliary Battery)   (See: Negative/Service and Repair).

Battery Positive Cable Replacement (Diesel)|Page 10193 > < Battery Positive Cable Replacement (Diesel)|Page 10191