chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Turbo Boost Sensor > < Intercooler Duct|Left|Page 5741
Page 2
background image

Installation Procedure

1. Important:  Lubricate the end of the duct prior to installation.

Working through the right wheelhouse, install the charged air cooler outlet duct.

2. Hand tighten the charged air cooler outlet duct clamp (1) at the charged air cooler.

3. Important:  Lubricate the end of the duct prior to installation.

Install the charged air cooler outlet duct to the intake.

Notice:  Refer to Fastener Notice in Service Precautions.

4. Tighten the charged air cooler outlet duct to intake hose clamps.

Tighten the clamps to 6 Nm (53 inch lbs.).

5. Install the right wheelhouse panel. 

Turbo Boost Sensor > < Intercooler Duct|Left|Page 5741