chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Power Steering Gear Inlet Pipe/Hose|Page 9759 > < Power Steering Gear Inlet Pipe/Hose|Page 9757
Page 17
background image

4. Remove the bolts (2) retaining the power steering cooler from the radiator support.
5. Remove the power steering cooler from the vehicle.

Installation Procedure

1. Notice:  

Refer to Fastener Notice in Service Precautions.

Install the power steering cooler (1) to the vehicle.
^

Tighten the power steering cooler retaining bolts to 5 Nm (44 inch lbs.).

2. Connect the power steering outlet hose (3) to the power steering gear (4).
3. Install the retaining clamp.
4. Connect the power steering inlet hose to the power steering pump.
5. Install the retaining clamp.
6. Bleed the power steering system. Refer to Bleeding the Power Steering System.
7. Inspect all the hose connections for leaks.
8. Install the front grille. Refer to Grille Replacement (GMC) Grille Replacement (Chevrolet) in Exterior Trim.

(Parallel Hybrid Truck)

Power Steering Cooler Pipe/Hose Replacement (Parallel Hybrid Truck)

Removal Procedure

1. Disconnect the energy storage box before servicing the vehicle. 
2. Remove the front grille. Refer to Grille Replacement (GMC) Grille Replacement (Chevrolet) in Exterior Trim.

Power Steering Gear Inlet Pipe/Hose|Page 9759 > < Power Steering Gear Inlet Pipe/Hose|Page 9757