chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Data Link Connector > < Coolant Temperature Sensor/Switch (For Computer)|Locations|Page 3969
Page 2
background image

3. Install the ECT sensor electrical connector to the oil fill tube bracket.

4. Connect the ECT sensor electrical connector (3).
5. Refill the cooling system. Refer to Draining and Filling Cooling System (w/RPO HP2) Draining and Filling Cooling System (w/o RPO HP2) in

Cooling System.

Data Link Connector > < Coolant Temperature Sensor/Switch (For Computer)|Locations|Page 3969