chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Procedures|Page 9861 > < Procedures|Page 9859
Page 4
background image

3. Connect the following electrical connectors:

-

TP sensor (1)

-

IAC valve (2)

4. Position the bracket and cables.
5. Install the accelerator control cable bracket with the cables attached, to the throttle body.
6. Install the accelerator control cable bracket nuts.

Tighten the nuts to 10 N.m (89 lb in).

7. Install the accelerator control cable slug to the throttle pulley.

Procedures|Page 9861 > < Procedures|Page 9859