chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

System Description|Page 1742 > < System Description|Page 1740
Page 2
background image

Fig. 6 Applying vacuum to purge control valve

CHARCOAL CANISTER

1.

Remove charcoal canister.

2.

Inspect canister for cracks or damage. Replace canister, if necessary.

3.

Check operation of purge control valve as follows:

a. Apply approximately 14 psi (50 kPa) to port marked V.C., Fig. 5. No air should leak from diaphragm.
b. Apply approximately 14.96 inches Hg vacuum to port marked PURGE and maintain vacuum, Fig. 6.
c. Apply vacuum gradually to the port marked V.C. If the purge control valve begins to open (vacuum gauge reading on the PURGE port

decreases) at a pressure between 1.6 and 3.2 inches Hg vacuum, the purge control valve is functioning normally.

4.

If valve operation is not as specified, replace charcoal canister.

System Description|Page 1742 > < System Description|Page 1740