Thermo Time Switch Locations - Fuel Delivery and Air Induction
Fig. 15 Checking starter injector time switch terminal
1.
Gradually warm switch, then check for specified resistance at temperatures shown, Fig. 14.
2.
Check resistance between starter injector time switch body and STA terminal as shown, Fig. 15.