Tahoe 2WD V8-5.3L (2007)
1. Position the EBCM (2) to the BPMV (3).
Notice: Refer to Fastener Notice.
2. Install 4 new EBCM to BPMV screws (1).
Tighten the screws in an X pattern to 3 N.m (27 lb in).
3. Connect the EBCM electrical connector.
4. If installing a replacement EBCM, program the replacement EBCM. Refer to Control Module References.
5. Bleed the BPMV. Refer to Antilock Brake System Automated Bleed Procedure (W/JL4) Antilock Brake System Automated Bleed Procedure
(W/O JL4).