chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Main Relay (Computer/Fuel System)|Locations|Page 3993 > < Main Relay (Computer/Fuel System)|Locations|Page 3991
Page 3
background image

DIAGNOSTIC AIDS

Check for any of the following conditions:
^

Check the resistance of the main relay. The resistance across terminal 3 and terminal 4 is 79 - 95 ohms at 20°C (68°F). The resistance across
terminal 1 and terminal 2 is infinite.

^

The main relay's electrical contacts may be pitted or sticking. Replace the main relay if tapping gently on the relay or wiggling the relay causes a
change in the relay's operation.

^

The temperature may affect the performance of the main relay. Check the main relay after sitting outside overnight and after running the engine for
30 minutes.

^

Check for a faulty electrical connection to the PCM.

A fault in the main relay electrical circuit may cause an intermittent malfunction. Inspect the wiring harness and components for any of the following
conditions:
^

Backed out terminals

^

Improper mating of terminals

^

Broken electrical connector locks

^

Improperly formed or damaged terminals

^

Faulty terminal to wire connections

^

Physical damage to the wiring harness

^

A broken wire inside the insulation

^

Corrosion of electrical connections, splices, or terminals

Main Relay Circuit Diagnosis

Use the relay cavity table in order to locate the correct cavities to probe during diagnosis. The table layout corresponds to the cavity layout of the relay
block.

TEST DESCRIPTION

The numbers below refer to the step numbers in the diagnostic table.
1. The Powertrain OBD System Check prompts the technician to complete some basic checks and to store the Freeze Frame data on the scan tool if

applicable. This creates an electronic copy of the data taken when the fault occurred. The information is then stored in the scan tool for later
reference.

6. This step will verify whether the PCM is not providing a ground path for the main relay circuit. When terminal 2 of the main relay is grounded, the

main relay turns ON.

9. This step checks for ignition positive voltage at the PCM. The PCM will not operate the main relay if there is no power to terminal C2-20.

11. This step checks for an open in the PCM electrical grounds. The PCM will not operate the main relay if there are no electrical grounds.

Main Relay (Computer/Fuel System)|Locations|Page 3993 > < Main Relay (Computer/Fuel System)|Locations|Page 3991